I tried for both drag week and RMRW 2.0 - both sold out in about 60 seconds.
I got so pissed I burnt all my PTO on a single 2.5 week stretch and did nothing but work on my house foundation...which took 6 months. By myself. Getting maybe 4 days every 3rd week to actually work. With a LS MT125 Tractor that had a 9" backhoe bucket. Absolutely 100% screw foundation waterproofing and footer drain projects. I'll burn the house down before I do it again.
Oh. And after all that...ended up getting called off the wait list for BOTH. DAMN. EVENTS. and having to decline BOTH because. Well. No PTO left!
Also after seeking out specifically a 4x8x4 enclosed trailer to fit within the previous drag week rules and outfitting it with a full slate of tools and gear. Probably had well over 3 grand in it.
Tempted to NEVER try to apply again.